Southwark live-site clearance for mixed contractor and strip-out waste
A Southwark workspace refit needed loose mixed site waste, fittings, and bulky leftovers removed so the next contractor could get back into the room.
Challenge
The site was still active, so the clearance had to happen without getting in the way of the next phase.
How it was scoped
The waste mix and loading point were reviewed in advance so the collection could be timed around the contractor schedule.
Outcome
The room was reopened for the next stage of works without a lingering pile of mixed materials slowing the job down.



