Pimlico flat handover with same-day pressure and tight building access
An upper-floor flat in a Pimlico mansion block needed mixed furniture, bagged rubbish, and loose move-out waste cleared before a new tenant handover window later the same day.
Challenge
The building had timed access, shared corridors, and no room for a drawn-out collection once the slot opened.
How it was scoped
The quote was built from photos, the route from the flat to the vehicle was confirmed in advance, and the team arrived ready for a labour-included clearance rather than a kerbside pickup.
Outcome
The flat was cleared, the route kept tidy, and the handover window stayed intact without the customer arranging extra labour.