Kensington refit waste removal planned around a tighter building window
A Kensington refurbishment needed mixed fit-out waste, packaging, and loose materials removed without spilling outside a limited collection window.
Challenge
The building access rules and finish standard mattered as much as the load itself.
How it was scoped
The collection was scoped around timing, the route out, and the waste mix so the team could load directly and leave the area orderly for the next contractor.
Outcome
The site was reset quickly enough for the next phase of works without leaving mixed materials stacked inside the property.